Structure a Multi-Phase Construction Quote with Milestone Draw Schedule
Use Case & Commercial Purpose: Ties every progress payment to a verifiable physical milestone or municipal inspection rather than arbitrary calendar dates.
Copy-Ready Prompt
Create a structured construction proposal summary for [Client Name] on [Project, e.g., 16×20 Detached Garage / Structural Framing & Foundation]. Break the work into 4 logical phases with a tied Draw Schedule: - Deposit / Mobilization ([%]) - Phase 1 Complete ([%]) - Phase 2 Complete ([%]) - Final Walkthrough & Sign-Off ([%]) Also include a short "Permits & Engineering" line clarifying whether municipal fees are pass-through at actual receipt cost.
Sample AI Output
CONSTRUCTION PROPOSAL — [Project] ([Total Price]) Phase Breakdown: 1. Site Prep & Foundation: Excavation, footings, rebar, and concrete slab pour. 2. Framing & Dry-In: Wall framing, roof trusses, sheathing, housewrap, and roofing. 3. Exterior & Openings: Siding, trim, exterior door, and window installation. 4. Rough MEP & Final Clean: Electrical rough-in (by licensed sub) and site broom-clean. Milestone Draw Schedule: - 20% Deposit: Upon contract signing & material order placement - 30% Draw 1: Upon passed foundation inspection & slab pour - 35% Draw 2: Upon framing & roof dry-in completion - 15% Final: Upon completed final walkthrough & punch-list sign-off Permits & Engineering: Municipal permit and structural engineering fees are billed at exact pass-through receipt cost with zero markup.
Ethical & Transparency Checkpoint
Keep final retention (10–15%) payable only after final walkthrough sign-off so the client has clear completion assurance.